Phone:
(435) 752-7692
About
Contact
Brands
Login
Cart
Welcome to Royal Wholesale Electric. Free Shipping on all items when you spend 200 dollars or more. Service - Integrity - Reliability
Ceiling
Chandeliers
Mini-Chandelier
Flush Mounts
Semi-Flush Mounts
Pendants
Mini-Pendants
Directional Lighting
Recessed Lighting
LED Chandeliers
Wall
Bathroom Fixtures
Wall Sconces
Wall Swing-Arm Lights
Picture Display Lights
LED Wall Lights
Fans
Indoor Ceiling Fans
Outdoor Ceiling Fans
Fan Blade Sets
Fan Light Kits
Fan Remotes
Fan Wall Controls
Lamps
Table Lamps
Floor Lamps
Desk Lamps
Tiffany Lamps
LED Lamps
Home Decor
Clocks
Mirrors
Boxes
Other
LED Home Decor
Outdoor
Exterior Flush Mounts
Hanging Lights
Post Lights
Exterior Fans
Wall Lanterns
LED Outdoor
Bulbs
Flood Bulbs
Fluorescent Light Bulbs
Halogen Bulbs
Krypton Light Bulbs
Other Bulbs
Rooms
Bathroom
Bedroom
Dining Room
Family Room
Entry Foyer
Game Room
Hallway
Kitchen
Living Room
No Image
Available
Image may not reflect selected features
Pre-Bent S Curve MonoRail (9ZU14)
BROWN MO HORIZ. S-CURVE ANT.B
Product Specification
Item #
9ZU14
Dimensions
Height: 0.60"
Width: 0.30"
Additional product details
Internal #
9ZU14
Category
Track Ltg.
Subcategory
Track Accessories
Finish
Bronze
Style
Contemporary
Option
Title 20
Category
Monorail Hardware
Finish
Antique Bronze
Style
Contemporary | Modern
Option
Dry Rated
Bulb Dimmable
False
Introduction Date
01/01/2005
Ship Carton Height
6.00
Ship Weight
3
Special Features
From the brand formerly known as Tech Lighting
Vendor Ship Method
UPS Fedex
Warranty
1 Year
Weight
1.10
24 Volt
False
Adjustable Head
False
Cable Field Cuttable
True
Cannot Ship To California
False
Cannot Ship To Canada
False
Damp Rated
False
Dark Sky
False
Dry Rated
False
FWC Compliant
False
Integrated LED
False
Item Color 1
Brown
Master Color
Brown
Motion Sensor Included
False
Photocell Included
False
Replaceable Lamp
False
Reversible
False
Safety Rating
ETL
Shape
Pre-bent S-curve
Sloped Ceiling Compatible
False
Solar Powered
False
SORAA
False
Stocking Type
Made to Order
System
MonoRail
Title 20
False
Title 24
False
Transformer Required
False
Warm Color Dimming
FALSE
WET IP65
False
Wet Rated
False
Finish
Additional options that would change other selections
Item Color 1
Additional options that would change other selections
Master Color
Additional options that would change other selections
Call for Price
Qty:
pkgs
pcs
BASE PRICE:
$
325
00
/
/ 1
($325.00 / 1)
Save
%
List Price:
$
Add To Cart
Add To Cart
Add To Estimate
Add To Wishlist
Save To Compare
Availability:
Manufacturer availability unknown. Call store for details.
To:
From:
Subject:
Hello, take a look at this great item that I found at Royal Wholesale Electric.
Send Email